User Tools

Site Tools


transport:aviation:engines:ge90_for_boeing_777_into_magadan

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
transport:aviation:engines:ge90_for_boeing_777_into_magadan [2023/06/14 15:49] – created wikiadmintransport:aviation:engines:ge90_for_boeing_777_into_magadan [2023/06/14 16:05] (current) wikiadmin
Line 1: Line 1:
 +
 +====== Transport of GE90 Engine  for Boeing 777 into magadan ======
 +
 +
 +
 +http://atrc.net.pk/dokuwiki/doku.php?id=transport:aviation:engines:ge90_for_boeing_777_into_magadan
 +
 +
 +
 +{{:transport:aviation:engines:ge_90_on_a_truck.jpg?400|}}
 +
 +
 +[[https://heavyhaulandoversized.com/process/aircraft-engine-transportation/|
 +Aircraft Engine Transportation: What You Need to Know]]
 +
 +
 +[[https://www.rhinestahl.com/cts/aftermarket-services/engine-stand-leasing/ge90-94b-115b-truck-stand-leasing-for-boeing-777/|
 +GE90-94B/115B TRUCK STAND LEASING FOR BOEING 777]]
 +
 +{{:transport:aviation:engines:magadan_air_india_boeing_777_ge90_engines.jpeg?400|}}
 +
 +
 +The GE90 jet engine, which is used in the Boeing 777 aircraft, is too large to be shipped by rail or highway in one piece. Therefore, the engines are shipped in sections and then assembled at the aircraft assembly building.One method used to transport the engines is by using the "Dreamlifter" aircraft, which is a modified Boeing 747-400. The Dreamlifter is capable of carrying large cargo, such as the GE90 engine sections, and is able to land at smaller airports that are closer to the assembly building.Another method is to use specialized heavy-duty trailers to transport the engines from the GE manufacturing facility to the assembly building. These trailers are equipped with hydraulic lifting systems to raise and lower the engines, as well as steering systems for maneuvering the engines through tight turns.Overall, the transportation of the GE90 engines is a complex and carefully planned operation, involving the coordination of multiple companies and specialized equipment.
 +
 +{{:transport:aviation:engines:ge90_antonov.png?400|}}
  
  
Line 8: Line 33:
  
 3. Select appropriate transportation equipment: Identify the right type of transportation equipment capable of carrying the GE90 engine. Depending on the weight and dimensions, specialized heavy-duty trucks, trailers, or multi-axle transporters may be required. Ensure that the equipment is in good condition and meets safety standards. 3. Select appropriate transportation equipment: Identify the right type of transportation equipment capable of carrying the GE90 engine. Depending on the weight and dimensions, specialized heavy-duty trucks, trailers, or multi-axle transporters may be required. Ensure that the equipment is in good condition and meets safety standards.
 +
 +
 +[[https://www.youtube.com/watch?v=5QHKB5kYsUo|
 +Emirates B77F unloads GE90 Engine (timelapse)]]
 +
 +
  
 4. Coordinate logistics: Arrange for a suitable loading site where the GE90 engine can be safely loaded onto the transportation equipment. This may involve using cranes, forklifts, or other lifting devices to transfer the engine onto the vehicle. 4. Coordinate logistics: Arrange for a suitable loading site where the GE90 engine can be safely loaded onto the transportation equipment. This may involve using cranes, forklifts, or other lifting devices to transfer the engine onto the vehicle.
Line 20: Line 51:
  
 It's important to note that the actual process may vary depending on the specific circumstances and regulations of the region. Engaging professional transportation and logistics companies experienced in moving heavy and oversized cargo would be highly recommended to ensure a successful transport operation. It's important to note that the actual process may vary depending on the specific circumstances and regulations of the region. Engaging professional transportation and logistics companies experienced in moving heavy and oversized cargo would be highly recommended to ensure a successful transport operation.
 +
 +
 +----
 +
 +
 +Passengers on the New Delhi-San Francisco flight, when they boarded the Air India Boeing 777, probably knew nothing about the existence of such a city in Russia as Magadan, none of them had likely ever been there in their lives and had not planned a trip there.
 +
 +However, eight hours after takeoff, while flying over Russian territory, one of the engines failed and the plane landed.... just in Magadan, at the local airport located in the town of Sokol. It is a small town located about 50 kilometers north of Magadan, with a population of about 5,000, and there are no logistical facilities necessary to accommodate the 216 passengers and 16 crew members of the Air India flight. Fortunately, school vacations had just begun in Russia, so the passengers were accommodated in the school building - in classrooms, corridors and a gym hall.
 +
 +After 38 hours at Magadan airport, the passengers continued their journey to San Francisco on another plane. 
 +
 +But this was not the end of the story for the Air India airline.
 +
 +Air India's Boeing 777-200LR, which suffered the malfunction, is equipped with the world's largest engines manufactured by American General Electric. One of the engines had to be replaced (according to unofficial sources). If this is confirmed - such process is not easy, as Russia is under sanctions on the import of aircraft parts. 
 +
 +But even if it manages to get a one-time permit to import the engine, the question remains how to get it to Magadan.
 +
 +The only aircraft in the world that can deliver a complete engine of this size is the Ukrainian An-124. For rather understandable reasons, the Antonov is unlikely to fly to Russia at present. 
 +
 +Another AN-124 user Arab Maximus airline also does not fly to Russia, while Russian carrier Volga Dnepr again cannot use the AN-124 it owns for overseas flights due to sanctions.
 +
 +Another aircraft that can deliver the engine to Russia is a cargo Boeing 747, but it could only deliver the engine in a disassembled state. However, there are no conditions in Magadan for the assembly and maintenance of B777 engines. 
 +
 +So pulling the stranded Boeing in Magadan back to Delhi could become quite a challenge for Air India, as could bringing in and installing a new engine.
 +
 + 
  
  
  
transport/aviation/engines/ge90_for_boeing_777_into_magadan.1686739799.txt.gz · Last modified: 2023/06/14 15:49 by wikiadmin