User Tools

Site Tools


atrc_website:vmware_course

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
atrc_website:vmware_course [2022/10/05 15:08] wikiadminatrc_website:vmware_course [2022/10/05 15:41] wikiadmin
Line 1: Line 1:
-====== VM Ware Course ======+====== VMware Course ======
  
 {{:atrc_website:atrc_logo_16_oct_2010-640_480.png?400|}} {{:atrc_website:atrc_logo_16_oct_2010-640_480.png?400|}}
Line 8: Line 8:
 By : Khawar Nehal (khawar@atrc.net.pk) By : Khawar Nehal (khawar@atrc.net.pk)
  
 +{{:atrc_website:vmware.jpg?400|}}
  
 Course Description: Course Description:
Line 15: Line 16:
 This course is the foundation for most of the other VMware technologies in the software-defined data center. This course is the foundation for most of the other VMware technologies in the software-defined data center.
  
-This course is also available in an On Demand format. For more information, select this link:  VMware vSphere: Install, Configure, Manage [V7] - On Demand.+**Product Alignment**
  
-Product Alignment+VMware ESXi 7.0
  
-• VMware ESXi 7.0 +VMware vCenter Server 7.0
- +
-VMware vCenter Server 7.0+
  
 +**Objectives**
  
 By the end of the course, you should be able to meet the following objectives: By the end of the course, you should be able to meet the following objectives:
  
-Describe the software-defined data center (SDDC) +Describe the software-defined data center (SDDC)
-• Explain the vSphere components and their function in the infrastructure +
-• Describe the benefits and capabilities of VMware Skyline +
-• Install and configure ESXi hosts +
-• Deploy and configure VMware vCenter® Server Appliance™ +
-• Use VMware vSphere® Client™ to manage the vCenter Server inventory and the vCenter Server  +
-   configuration +
-• Manage, monitor, back up, and protect vCenter Server Appliance +
-• Create virtual networks with vSphere standard switches +
-• Describe the storage technologies supported by vSphere +
-• Configure virtual storage using iSCSI and NFS storage +
-• Create and manage VMware vSphere® VMFS datastores +
-• Use the vSphere Client to create virtual machines, templates, clones, and snapshots +
-• Create a content library and deploy virtual machines from templates in the library +
-• Manage virtual machine resource use +
-• Migrate virtual machines with VMware vSphere® vMotion® and VMware vSphere® Storage vMotion® +
-• Create and manage a vSphere cluster that is enabled with VMware vSphere® High Availability and  +
-   VMware vSphere® Distributed Resource Scheduler™ +
-• Discuss solutions for managing the vSphere life cycle +
-• Use VMware vSphere® Lifecycle Manager™ to perform upgrades to ESXi hosts and virtual machines+
  
-Certifications +Explain the vSphere components and their function in the infrastructure
-Attending this course meets the training requirement to achieve the following certification: +
-• VMware Certified Professional – Data Center Virtualization (VCP-DCV)+
  
-IT Project Management: Fundamentals overviews the basics of project management. It provides the theory and core methodology you will need to manage projects or participate  +Describe the benefits and capabilities of VMware Skyline
-on project teams.+
  
-This course uses openproject as a project management software application+Install and configure ESXi hosts
  
-Target Student:+Deploy and configure VMware vCenter® Server Appliance™
  
-Students enrolling in this course should be planning to lead a project (primary audience) or+Use VMware vSphere® Client™ to manage the vCenter Server inventory and the vCenter Server configuration
  
-serve on a project team (secondary audience).+Manage, monitor, back up, and protect vCenter Server Appliance
  
-Prerequisites:+Create virtual networks with vSphere standard switches
  
-To ensure your success, we recommend you have some working knowledge of computer usage. +Describe the storage technologies supported by vSphere
  
-The basics are covered in the our OCDL course.+Configure virtual storage using iSCSI and NFS storage
  
 +Create and manage VMware vSphere® VMFS datastores
  
-[[http://atrc.net.pk/products/training/ocdl/ttc%20muftasoft%20open%20computer%20driving%20license%20ocdl%204%20april%202020-1.pdf| +Use the vSphere Client to create virtual machines, templates, clones, and snapshots
-Open Computer Driving License (OCDL)]]+
  
 +Create a content library and deploy virtual machines from templates in the library
  
 +Manage virtual machine resource use
  
-Benefits:+Migrate virtual machines with VMware vSphere® vMotion® and VMware vSphere® Storage vMotion®
  
-Students will learn how to use project management techniques to plan, organize, control,+Create and manage a vSphere cluster that is enabled with VMware vSphere® High Availability and  
 + VMware vSphere® Distributed Resource Scheduler™
  
-document, and close out their projects successfully and with minimum risk.+Discuss solutions for managing the vSphere life cycle
  
-Performance Based Objectives :+Use VMware vSphere® Lifecycle Manager™ to perform upgrades to ESXi hosts and virtual machines
  
-Upon successful completion of this course, students will be able to:+Certifications
  
-• Discuss the phases of the Project Management Life Cycle and a project manager's  +Attending this course meets the training requirement to achieve the following certification:
-role in each phase.+
  
-• List and discuss basic project success criteria and common reasons for project  +VMware Certified Professional – Data Center Virtualization (VCP-DCV)
-failure.+
  
-• Discuss techniques for setting up a strong project team. 
  
-• List and discuss elements of a Risk Management Plan.+**Target Student:**
  
-• Discuss techniques for planning and sequencing project activities, including the+Students enrolling in this course should be either system administrators or planning to work in the field of system administration. 
  
-Work Breakdown Structure and the Network Logic Diagram.+**Prerequisites:**
  
-• Identify the Critical Path for completing a project on schedule.+To ensure your success, we recommend you have some working knowledge of computer usage
  
-• List and discuss the cost elements that should be included in a project budget.+The basics are covered in the our OCDL course.
  
-• Discuss techniques for controlling for deviation from budgets and schedules.+[[http://atrc.net.pk/products/training/ocdl/ttc%20muftasoft%20open%20computer%20driving%20license%20ocdl%204%20april%202020-1.pdf| 
 +Open Computer Driving License (OCDL)]]
  
-• Discuss key elements of project management communications and reporting tools.+Also basic system administration knowledge of a computers, networks and operating systems is also a prerequisite for this course
  
-• Discuss key activities of project closeout. 
  
-  +**Benefits:**
-===== Analysis of Requirements =====+
  
 +Students will learn how to use project management techniques to plan, organize, control,
  
-Match competence to scenario+document, and close out their projects successfully and with minimum risk.
  
-Evaluate a project business case 
  
 +**Outline**
  
-===== Stakeholders ===== 
  
-Identify and assess stakeholders+**Course Introduction**
  
-Stakeholders+Introductions and course logistics
  
-Resource management+Course objectives
  
-Teams+**Introduction to vSphere and the Software-Defined Data Center**
  
-===== Scope =====+Explain basic virtualization concepts
  
-  +Describe how vSphere fits into the software-defined data center and the cloud infrastructure
  
-Define product scope+Explain how vSphere interacts with CPUs, memory, networks, and storage
  
-Project charter+Recognize the user interfaces for accessing the vCenter Server system and ESXi hosts
  
-Product and project scope+Describe the ESXi host architecture
  
-Decompose product scope into stakeholder requirements+Navigate the Direct Console User Interface (DCUI) to configure an ESXi host
  
-Create WBS and dictionary+Recognize ESXi host user account best practices
  
-Work breakdown structure+Install an ESXi host
  
 +Use VMware Host Client™ to configure ESXi host settings
  
-===== Risk Management ===== +Describe how to proactively manage your vSphere environment using VMware Skyline
- Cause-and-effect diagram+
  
-Risk register+**Virtual Machines**
  
-SWOT analysis+Create and provision a virtual machine
  
-Create risk register+Explain the importance of VMware Tools™
  
-Risk identification and management+Install VMware Tools
  
-ICT Risk Management+Identify the files that make up a VM
  
-Project Risk +Recognize the components of a VM
  
 +Recognize virtual devices supported by a VM
  
 +Describe the benefits and use cases for containers
  
-===== The Project Team =====+Identify the parts of a container system
  
 +**vCenter Server**
  
-The Teamwork Challenge+Describe the vCenter Server architecture
  
-Selecting Team Members+Discuss how ESXi hosts communicate with vCenter Server
  
-The Team Charter+Deploy and configure vCenter Server Appliance
  
 +Use vSphere Client to manage the vCenter Server inventory
  
-==== Communication ====+Add data center, organizational objects, and hosts to vCenter Server
  
 +Use roles and permissions to enable users to access objects in the vCenter Server inventory
  
-Develop a communication plan+Back up vCenter Server Appliance 
  
-Responsibility assignment (RACI) matrix+Monitor vCenter Server tasks, events, and appliance health
  
-Run charts+Use VMware vCenter Server® High Availability to protect a vCenter Server Appliance 
  
-Project Cycle Optimisation (PCO)+Configuring and Managing Virtual Networks
  
-Participatory Impact Pathways Analysis (An approach for developing common understanding and consensus amongst project participants and stakeholders as to how the project will achieve its goal)+Create and manage standard switches
  
-Logical framework approach+Describe the virtual switch connection types
  
-===== Project management activities =====+Configure virtual switch security, traffic-shaping, and load-balancing policies
  
-Project management is composed of several different types of activities such as:+Compare vSphere distributed switches and standard switches
  
-    Analysis and design of objectives and events +**Configuring and Managing Virtual Storage**
-    Planning the work according to the objectives +
-    Assessing and controlling risk (or Risk Management) +
-    Estimating resources +
-    Allocation of resources +
-    Organizing the work +
-        http://en.wikipedia.org/wiki/Work_(project_management) +
-        http://www.projectsmart.co.uk/introduction-to-project-management.html +
-    Acquiring human and material resources +
-        http://www.businessballs.com/freeonlineresources.htm +
-    Assigning tasks +
-    Directing activities +
-    Controlling project execution +
-    Tracking and reporting progress (Management information system) +
-    Analyzing the results based on the facts achieved +
-    Defining the products of the project +
-    Forecasting future trends in the project +
-    Quality Management +
-    Issues management +
-    Issue solving +
-    Defect prevention +
-    Identifying, managing & controlling changes +
-    Project closure (and project debrief) +
-    Communicating to stakeholders+
  
 +Identify storage protocols and storage device types 
  
 +Discuss ESXi hosts using iSCSI, NFS, and Fibre Channel storage
  
 +Create and manage VMFS and NFS datastores 
  
-===== Project management artifacts =====+Explain how multipathing works with iSCSI, NFS, and Fibre Channel storage
  
-The following documents serve to clarify objectives and deliverables and to align sponsors, clients, and project team's expectations.+Recognize the components of a VMware vSAN™ configuration
  
-    Project Charter +**Virtual Machine Management**
-    Preliminary Scope Statement / Statement of work +
-    Business case / Feasibility Study +
-    Scope Statement / Terms of reference +
-    Project management plan / Project Initiation Document +
-    Work Breakdown Structure +
-    Change Control Plan +
-    Risk Management Plan +
-    Risk Breakdown Structure +
-    Communications Plan +
-    Governance Model +
-    Risk Register +
-    Issue Log +
-    Action Item List +
-    Resource Management Plan +
-    Project Schedule +
-    Project Status Report +
-    Responsibility assignment (RACI) matrix +
-    Database of lessons learned +
-    Stakeholder Analysis +
-    Document Management+
  
-These documents are normally hosted on a shared resource (i.e., intranet web page) and are available for review by the project's stakeholders (except for the Stakeholder Analysis, since this document comprises personal information regarding certain stakeholders. Only the Project Manager has access to this analysis). Changes or updates to these documents are explicitly outlined in the project's configuration management (or change control plan).+Use templates and cloning to deploy new virtual machines
  
-===== Project Management tools =====+Modify and manage virtual machines
  
-Project Management tools include following:+Create a content library and deploy virtual machines from templates in the library
  
-==== Financial tools ====+Use customization specification files to customize a new virtual machine
  
 +Perform vSphere vMotion and vSphere Storage vMotion migrations
  
 +Describe the Enhanced vMotion Compatibility feature
  
-    Earned value management +Create and manage virtual machine snapshots
-     +
-    Monte Carlo methods in finance+
  
 +Examine the features and functions of VMware vSphere® Replication™ 
  
 +Describe the benefits of VMware vSphere® Storage APIs – Data Protection
  
-==== General management tools ====+**Resource Management and Monitoring**
  
-  * Online tools to run Project Health Check (Ph-Check tool), take a baseline or checkpoint, or to generate highlight, or status reports.+Discuss CPU and memory concepts in virtualized environment
  
-==== Scheduling charts ====+Describe what overcommitment of a resource means
  
 +Describe methods for optimizing CPU and memory usage
  
 +Use various tools to monitor resource use
  
-    PERT charts +Create and use alarms to report certain conditions or events
-    Gantt charts +
-    Event Chain Diagrams+
  
 +**vSphere Clusters**
  
-===== Related lists =====+Describe the functions of a vSphere DRS cluster
  
 +Create a vSphere DRS cluster
  
-    Glossary of project management +Monitor a vSphere cluster configuration
-    List of management topics +
-    List of production topics +
-    List of project management software +
-    List of Theory of Constraints topics +
-    Timeline of project management+
  
-  Establish quality metrics +Describe options for making vSphere environment highly available
-  Create an initial schedule and budget +
-      Effort and duration +
-      Estimating effort +
-      Level of accuracy in estimates +
-      Team-based estimation +
-      Scheduling +
-      Estimating cost +
-  Review and disposition change request +
-      Change management +
-  Plan a project rollout +
-      Testing +
-      Release management +
-  Use metrics to reassess the business case +
-      Delivering business value+
  
 +Explain the vSphere HA architecture
  
-===== The Project Management Life Cycle =====+Configure and manage a vSphere HA cluster
  
 +Examine the features and functions of VMware vSphere® Fault Tolerance
  
-What is a Project?+Describe the function of the vSphere® Cluster Service
  
-The Project Management Life Cycle+**vSphere Lifecycle Management**
  
-The Role of the Project Manager+Recognize the importance of vCenter Server Update Planner
  
-===== Setting Up for Success =====+Describe how VMware vSphere® Lifecycle Manager™ works
  
 +Describe how to update ESXi hosts using baselines
  
-The Meaning of Success+Validate ESXi host compliance using a cluster image
  
-What Happens in the Initiation Phase? +Describe how to upgrade VMware Tools and VM hardware
- +
-Project Definition and Scope +
- +
-Putting Together a Statement of Work +
- +
-The Project Charter +
- +
- +
- +
- +
- +
-===== The Project Team ===== +
- +
- +
-The Work Breakdown Structure +
- +
-Work Package Sequencing +
- +
- +
-===== The Project Schedule ===== +
- +
- +
-The Scheduling Process +
- +
-Time Estimates +
- +
-===== The Project Budget ===== +
- +
- +
-What is a Budget? +
- +
-Creating a Preliminary Budget +
- +
-Budget and Schedule Balancing +
- +
-===== Project Tracking and Control ===== +
- +
- +
-Moving the Project Forward +
- +
-Monitoring for Project Progress +
- +
-Earned Value Analysis +
- +
-Getting Back on Track +
- +
-===== Project Reports ===== +
- +
- +
-Communications Overview +
- +
-Project Performance Reports +
- +
-Project Change Requests +
- +
-===== Closing ===== +
- +
-Close out a project +
- +
-Elements of Closeout +
- +
-Evaluation of People and Projects +
- +
-  +
- +
- +
-===== Integration Management ===== +
-  +
- +
-===== Time Management ===== +
- +
-  +
- +
-===== Compensation Management ===== +
-  +
-  +
- +
-===== Cost Management ===== +
- +
- +
-  +
- +
-  +
- +
-===== Quality Management ===== +
- +
- +
-  +
- +
-  +
- +
-===== Human Resource Management ===== +
-  +
- +
-===== Communications Management ===== +
-  +
- +
-===== Procurement Management ===== +
- +
-  +
- +
-===== Stakeholder Management ===== +
- +
-  +
- +
-===== Agile ===== +
-  +
- +
-===== Scrum ===== +
- +
-  +
-===== Methodology ===== +
- +
- +
-  * Learn about project management, organizational project management, and project management maturity +
-  +
- +
-  +
- +
-  * Understand the essentials for effectively managing a project +
- +
-  +
-  +
- +
-  * Learn a simplified project methodology, including stages and stage gates +
- +
-  +
-  +
- +
-  * Learn how to start the project right and continue on the right path toward achieving project strategic objectives +
- +
-  +
-  +
- +
-  * Apply the learning to develop the PM and Project Detailed Plans  +
- +
-  * Understand project implementation, control, handover, and closure +
-  +
-  +
-===== Certifications ===== +
- +
-PMP  +
- +
-prince2 +
- +
-program_management +
- +
-scrum  +
-  +
-  +
- +
-  +
- +
-**APM Certifications ** +
- +
-Project, Program & Portfolio Management  +
- +
-PMI Certifications +
  
 +Describe VMware vSphere® Lifecycle Manager™ and VMware vSAN™ integration
  
  
Line 484: Line 257:
 **What is included :**  **What is included :** 
  
-1 hour of teacher online time per participant+40 hours of teacher in the classroom.
  
-If participants discuss in a group, the total time available shall increase+Up to 20 participants. 
  
-Example : If a group of 10 participants attend a 1 hour discussion, only 6 minutes of teacher time shall be counted from each participant's one hour available.+10 Assignments 
  
-23 Assignments  +10 Quizzes 
- +
-23 Quizzes +
  
 3 Vivas  3 Vivas 
Line 507: Line 278:
 {{:atrc_website:fees1.jpg?400|}} {{:atrc_website:fees1.jpg?400|}}
  
-PKR 50,000 per participant +PKR 100,000 per participant
- +
-Limited time and limited intake offer  +
- +
-Inside Pakistan : PKR 5,000  +
- +
-Outside Pakistan PKR 6,000  +
- +
-Duration : 2 Months maximum from the start. +
  
-This course requires about 115 hours of study. This is about 2 hours per day for 60 days. +Duration : 5 days. 9 to 5 classroom
  
-{{:atrc_website:financial_aid_1.jpeg?400|}}+Tentative time for course to run October or November 2022
  
-Financial aid and student loans also available for cases which need it. Anyone can apply. 
  
  
  
atrc_website/vmware_course.txt · Last modified: 2022/10/05 18:40 by wikiadmin